Life Sciences: Lean Operations Management (Supply Chain, Logistics, Capacity & Production planning)
The company was experiencing issues with Quality Control (QC) Laboratory Materials Management, QC Column Controls and a specific manufacturing process. As a result of the Leading Edge Associates Lean Plus program, there was an 18% reduction in cycle times, 4.5% reduction in costs and a significant €50k cost saving from improvements in cleaning between batches.