Client results

What Our Clients Have Achieved

Measurable operational improvements delivered across healthcare, government, manufacturing, and professional services organizations across Canada.

90+ Canadian clients served
20 Full case studies
46 Project results
7 Sectors

Case studies

Results our clients have measured

Named clients cite the public document; others are described by type only. Filter by sector or by the kind of impact you are after.

Full case studies

Local GovernmentTown of Gravenhurst

Town of Gravenhurst created 5,192 hours of capacity a year

Gravenhurst's Lean program: 22 Green Belts, 16 projects, $758,902 in savings identified and 5,192 hours of annual capacity over three years.
As reported in public documents Read the case study →
HealthcareCIUSSS West-Central Montreal

CIUSSS West-Central Montreal earned Gold-level Lean designation for four units

Four CIUSSS West-Central Montreal units earned Gold-level Lean certification, scoring 4.9 out of 5; the first healthcare network so designated.
As reported in public documents Read the case study →
HospitalityA multi-site services operator

A multi-site services operator cut its weekly financial reporting cycle by 71% in a three-site pilot

A Green Belt project cut a multi-site operator's weekly financial reporting cycle from 12.05 to 3.5 hours in a three-site pilot, with fewer errors.
Measured Read the case study →
UtilitiesAquatera Utilities Inc.

Aquatera realized $980,000 in savings through the Aquatera Way

The Aquatera Way: safety audit scores up from 89% to 96%, $980,000 in realized savings and 95% of employees certified in Lean training.
As reported in public documents Read the case study →
Local GovernmentCity of Kitchener

City of Kitchener targeted a 70% reduction in aggregate write-offs

Lean review of Kitchener's aggregate and weigh scale process: projected 70% cut in $51,000 annual write-offs and 310 staff hours released a year.
Projected Read the case study →
HealthcareKindera Living

Kindera Living: Building a Culture of Continuous Quality Improvement

Since 2018, Kindera Living has built Lean quality improvement capability across its homes, with 45+ Green Belts and 91 Yellow Belts certified.
As reported in public documents Read the case study →
UtilitiesA regulated utility

A regulated utility identified $1.7M in annual opportunities

An OpsScan Diagnostic identified $1.7M in annual improvement opportunities for a regulated utility; Year 1 net benefit was $1.5M.
Measured Read the case study →
Local GovernmentCity of Kitchener

City of Kitchener review identified $190,195 a day in fleet availability

Lean review of Kitchener's fleet repair and maintenance identified 10% less downtime, worth $190,195 a day in fleet asset availability and 3,792 hours.
As reported in public documents Read the case study →
HealthcareA community hospital

A community hospital reduced falls with harm by 41%

A community hospital Black Belt project on falls prevention and purposeful rounding cut the corporate rate of falls with harm by 41%.
Measured Read the case study →
Local GovernmentCity of Kitchener

City of Kitchener modernized its market service

Lean review of Kitchener Market: event set-up cut from 40 to 5 minutes in a pilot, and an estimated 200 to 300 hours of stall renewal effort removed.
As reported in public documents Read the case study →
HealthcareA regional health system

A regional health system cut bed turnover from 4 days to 2.25

A regional health system improved discharge planning and alternate level of care processes, reducing average bed turnover from 4 days to 2.25 days.
Measured Read the case study →
Local GovernmentCity of Mississauga

City of Mississauga built a corporate Lean program of 97 projects

Mississauga's Lean program: 97 completed projects, 2,000+ small improvements, 2,500+ staff trained, and a 2018 Continuous Improvement Excellence Award.
As reported in public documents Read the case study →
HealthcareA hospital

A hospital redesigned how its pharmacy manages inventory

A hospital redesigned pharmacy inventory management around centralized purchasing and lean inventory practices; inventory cost fell 26%.
Measured Read the case study →
Local GovernmentTown of Paradise

Town of Paradise cut enforcement tracking lead time by 37%

Town of Paradise staff trained in Lean improved enforcement issue tracking lead time by about 37% and cost efficiency by about 42%.
As reported in public documents Read the case study →
Local GovernmentTown of Tillsonburg

Town of Tillsonburg mapped seven planning application processes ahead of Bill 109

A Lean review of seven Town of Tillsonburg and Oxford County planning processes, with a phased plan to add capacity ahead of Bill 109.
As reported in public documents Read the case study →
Local GovernmentCity of Delta

City of Delta reviewed building permit application intake

A Lean review of the City of Delta's development application intake, with preliminary recommendations presented to the Mayor's Task Force in May 2022.
As reported in public documents Read the case study →
Local GovernmentCity of St. John's

City of St. John's: a Lean partnership since 2017

Since 2017, Leading Edge has supported the City of St. John's with Lean training and guidance as the City builds its own continuous improvement capability.
As reported in public documents Read the case study →
Local GovernmentA mid-sized city

A mid-sized city cut its vehicle inspection process from 383 to 36 minutes

A mid-sized city moved fleet inspections from paper to a digital workflow, cutting process time from 383 to 36 minutes.
Measured Read the case study →
Local GovernmentA regional government

A regional government designed one standard planning approvals process for eight offices

A regional government and its area municipalities designed one standard planning application process, with a projected 41% shorter lead time.
Designed, projected Read the case study →
Local GovernmentA county government

A county government cut its payroll cycle time by 37%

A county government trained staff at three belt levels and cut payroll cycle time by 37% through a staff-led Lean project.
Measured Read the case study →

Project results

Individual improvement projects, many delivered by the client's own staff as they earned a Lean Six Sigma belt with our coaching.

Local GovernmentA municipal sewerage and drainage operation

Sewerage and drainage review identifies condition-based cleaning and better fleet use

Seven current state process maps and more than 40 recommendations, with projected annual cost avoidance of $85K to $105K from condition-based drainage cleaning and a projected $91,800 a year from raising hydrovac utilization from 73 to 82% to 92 to 96%.
Projected
HealthcareAn outpatient clinic

Nursing documentation time reduced by 56%

56% reduction in nursing documentation time.
Measured
HospitalityA multi-site services operator

Cafeteria restocking time cut from 35 to 11 minutes at the pilot site

Measured at the pilot site, restocking fell from 35 to 11 minutes for one product line and from 124 to 54 minutes for another, and attendants no longer obstruct customers mid-service.
Measured Client-led, LEA-coached
UtilitiesA municipal utility

Paper work orders replaced with a digital workflow for about 650 orders a year

A digital workflow was implemented for approximately 650 annual work orders, replacing a paper-based process, and inventory management moved from manual spreadsheets to automated threshold alerts.
Measured
ManufacturingA packaging manufacturer

Changeover time cut from 4 hours to 45 minutes

Changeover time reduced from 4 hours to 45 minutes.
Measured
Food and AgricultureA federal accredited laboratory

Centralized consumables inventory supports timely preventive maintenance

A centralized inventory now tracks parts usage, availability and stock reduction, reducing inventory waste and time spent searching for parts, and laboratory staff earned Green Belt certification.
Implemented Client-led, LEA-coached
Professional ServicesAn insurance company

Claims processing cycle time reduced by 28%

28% cycle time reduction in claims processing.
Measured
Local GovernmentA town government

Four service delivery reviews give enforcement and permitting clear ownership

Future state designs included risk-based assessment tiers for enforcement files, a single point of contact and standard case transfer documentation for site alteration enforcement, and a tiered classification and redesigned intake for special events.
Designed, projected
HealthcareA long-term care home

Admissions moved from three days to same day

Admission process reduced from 3 days to same-day admission.
Measured
HospitalityA multi-site services operator

58 minutes of cleaning time saved a day with no capital spend

An average of 58 minutes of cleaning time saved a day, with no capital spend because the gain came from equipment already on site.
Measured Client-led, LEA-coached
ManufacturingAn auto parts supplier

Defects reduced by 60%

60% defect reduction.
Measured
Food and AgricultureA federal accredited laboratory network

One controlled vendor list adopted across four laboratories

A standardized master vendor list was adopted across four laboratories, meeting ISO/IEC 17025 critical-vendor and federal procurement requirements, with quality and procurement information held in one controlled, versioned tool and sustainment training at each lab.
Implemented Client-led, LEA-coached
Professional ServicesAn accounting firm

25% of capacity freed through workflow redesign

25% capacity freed up through workflow optimization.
Measured
Local GovernmentA regional government

Contact centre scheduling rebuilt around an 80% in 30 seconds service target

Scheduling was optimized across phone, counter, email and social media channels for 21 representatives, with the service level target moved from 70% to 80% of calls answered in 30 seconds.
Designed, projected
HealthcareA public health unit

Inspection capacity increased by 22%

22% capacity increase in public health inspections.
Measured
HospitalityA multi-site services operator

17% lower contracted price on the highest-volume consumable; savings being confirmed

The per-case price is 17% lower for the highest-volume item, one harsh, non-essential cleaning chemical was removed from the order guide, and a controlled two-site pilot is confirming savings before wider rollout.
Measured Client-led, LEA-coached
ManufacturingAn aerospace manufacturer

Throughput increased by 18% through line balancing

18% throughput increase from assembly line balancing.
Measured
Food and AgricultureA federal accredited laboratory

Hazardous waste handling standardized with clear roles

The hazardous waste process was standardized with clear roles for analysts and officers, the chemical waste storage room was reorganized through 5S, and laboratory staff earned Green Belt certification.
Implemented Client-led, LEA-coached
Professional ServicesA legal aid organization

Case intake time reduced by 40%

40% intake time reduction.
Measured
Local GovernmentA regional government

Supply chain review finds 69% of stocked items with low or no movement

An ABC classification of 2,786 SKUs at one site found 69% had low or no movement, and the review produced 23 prioritized recommendations and a three-year implementation roadmap.
Designed, projected
HealthcareA children's mental health agency

156 minutes of process waste removed per employee

156 minutes of waste eliminated per employee in organizational processes.
Measured Client-led, LEA-coached
HospitalityA multi-site services operator

Turnover cost model approved by senior leadership, with scope expanded

The model and engagement approach were approved by senior leadership and the scope was expanded.
Designed, projected Client-led, LEA-coached
ManufacturingA global biotechnology company

Green Belt projects coached in a certified quality system

Green Belt candidates were coached through improvement projects in their own laboratory and manufacturing areas.
Implemented Client-led, LEA-coached
Food and AgricultureA food manufacturer

Work-in-progress inventory reduced by 35%

35% WIP (work-in-progress) reduction.
Measured
Professional ServicesA managed services provider

Ticket resolution time improved by 50%

50% improvement in ticket resolution time.
Measured
Local GovernmentA municipal horticulture department

690+ administrative hours recovered a year

690+ admin hours recovered annually.
Measured
HealthcareAn academic health centre

Surgical instrument reprocessing cycle time reduced by 40%

40% cycle time reduction in surgical instrument reprocessing.
Measured
HospitalityA multi-site services operator

Onboarding time projected to fall from ~22 to ~9 hours per new hire

Onboarding time is projected to fall from ~22 to ~9 hours per new hire; a pilot is scheduled.
Projected Client-led, LEA-coached
ManufacturingA manufacturing warehouse

Warehouse rack space use cut by 40% with 5S

40% less rack space used, no receiving errors in the audited sample, and search time cut from 5 minutes to 3.
Measured
Local GovernmentA mid-sized city

Digital timesheets eliminate 10,621 pages of paper a year

10,621 pages of paper eliminated a year, with 20 to 37% cost avoidance confirmed against the $32,443.09 annual baseline.
Measured Client-led, LEA-coached
HealthcareA mental health centre

Assessment slots right-sized from 90 to 75 minutes to improve access

Assessment slot duration was reduced from 90 to 75 minutes, and one patient group was fast-tracked directly to assessment, removing a hand-off that added no clinical value.
Measured
HospitalityA multi-site services operator

Health and safety compliance lead time simulated to fall from ~169 to ~70 days

Lead time is simulated to fall from ~169 days to ~70 days; a pilot is starting.
Simulated Client-led, LEA-coached
Local GovernmentA mid-sized city

Half an hour saved on every capital invoice

0.5 hours saved per invoice.
Measured Client-led, LEA-coached
HealthcareA community hospital

Emergency department wait times reduced by 31%

31% wait time reduction in Emergency Department.
Measured
Local GovernmentA mid-sized city

Recruitment playbook reaches 100% adoption and improves data accuracy by 40%

100% adoption across client groups and a 40% improvement in data accuracy; the playbook is now a corporate standard with an annual update cadence.
Measured Client-led, LEA-coached
HealthcareAn urgent care centre

Urgent care setup time reduced by 42%

42% less setup time, with better staff feedback on the new arrangement.
Measured
Local GovernmentA mid-sized city

60 standard operating procedures created in two months

60 standardized SOPs created over 2 months under a single naming convention.
Measured Client-led, LEA-coached
HealthcareA long-term care provider

Nutrition review documentation errors cut by 73.1%

73.1% fewer documentation errors and 134.4 hours of dietitian time saved a year.
Measured
Local GovernmentA mid-sized city

Invoice email delivery wait cut from 2,100 minutes to 1

Invoice email delivery wait time fell from 2,100 minutes to 1 minute (99%), and 7,863 minutes were saved per cycle.
Measured Client-led, LEA-coached
HealthcareA public health unit

Vaccine waste held to 0.31% across 333,055 doses

333,055 doses delivered, with reported vaccine waste of 0.31%.
Measured
Local GovernmentA mid-sized city

Parks waste collection routes cut diesel cost by $19,872 a year

A documented $19,872 a year diesel reduction and $9,770 in cost avoidance, with 305 staff hours saved annually.
Measured Client-led, LEA-coached
Local GovernmentA mid-sized city

Contract review time halved, saving 323 hours in three months

Contract review time fell from 8 hours to 4 hours, with $24,250 in measured savings and 323 employee hours saved from January to March 2025, and 95% adoption.
Measured Client-led, LEA-coached
Local GovernmentA mid-sized city

About 19 hours saved on each archive request

About 19 hours saved per archive request.
Measured Client-led, LEA-coached
Local GovernmentA city Lean program

Lean training program delivery time cut by 69%

69% less resource time to deliver the program.
Measured
Local GovernmentA municipality

Integrated counter services save about $167K a year

About $167K in annual savings, 50% shorter lead time and 50% fewer in-person visits.
Measured
Local GovernmentA municipality

Budget reporting modernized, saving $270K

$270K in cost savings and 50% less manual reporting effort.
Measured

Our clients

Organizations we have worked with

Hospitals, health authorities, public health units, municipalities, community agencies, colleges and companies across Canada.

Healthcare, public health and community services (51)

  • Alzheimer Society Peel
  • Canadian Foundation for Healthcare Improvement
  • Canadian Mental Health Association
  • Central Health
  • Centre de santé communautaire du Témiskaming
  • Cornwall Community Hospital
  • Crossroads Children's Mental Health Centre
  • Eastern Ontario Health Unit
  • Extendicare
  • Feed Ontario
  • The Four Villages Community Health Centre
  • Hands TheFamilyHelpNetwork
  • Humber River Health
  • Interior Health
  • Island Health
  • Lakeridge Health
  • LAMP Community Health Centre
  • North Bay Regional Health Centre
  • Northern Health
  • Northwestern Health Unit
  • Nova Scotia Health
  • Ontario Addiction Treatment Centres
  • Ontario Health (Cancer Care Ontario)
  • The Orthotic Group
  • Responsive Group
  • Rideauwood Addiction and Family Services
  • Runnymede Healthcare Centre
  • Sault Area Hospital
  • Shepherd Village
  • SickKids Centre for Community Mental Health
  • Soldiers' Memorial Hospital
  • South Georgian Bay Community Health Centre
  • South Riverdale Community Health Centre
  • St. Joseph's Healthcare Hamilton
  • Street Haven
  • Thresholds Homes and Supports
  • Thunder Bay Counselling
  • Thunder Bay District Health Unit
  • Trillium Health Partners
  • Turning Point Youth Services
  • University Health Network
  • Valoris
  • Vancouver Coastal Health
  • Vanier Community Service Centre
  • Waypoint Centre for Mental Health Care
  • Wellington-Dufferin-Guelph Public Health
  • William Osler Health System
  • Women's College Hospital Foundation
  • Woodview Mental Health and Autism Services
  • Youth Services Jeunesse
  • Youthdale

Municipal and government (25)

  • Belleville
  • Brampton
  • Brantford
  • Cambridge
  • City of Guelph
  • City of Ottawa
  • Clarington
  • Cornwall
  • Delta
  • Durham Region
  • Government of Northwest Territories
  • Grande Prairie
  • Gravenhurst
  • London
  • Mohawk Council of Akwesasne
  • Moose Jaw
  • Niagara Falls
  • Oakville
  • Region of Waterloo
  • Richmond
  • Saugeen Shores
  • St. John's
  • Tillsonburg
  • Town of Paradise
  • York Region

Corporate, industrial and education (18)

  • Agropur
  • Aquatera
  • Bow Valley College
  • Brant InStore
  • Burlodge
  • Cambridge Brass
  • CLEAResult
  • Compass Group
  • Fluor
  • Gescan
  • Kasian
  • Multiplex
  • NorQuest College
  • Parmalat
  • Stantec
  • thyssenkrupp
  • Toronto Metropolitan University
  • TransUnion

Includes work completed prior to transition to Leading Edge Associates.

Resources

Downloadable Case Studies

Case Study Healthcare

Improving Patient Flow Through Structured Care Planning

A Black Belt project showing how structured Lean methodology improved patient flow and reduced wait times in a hospital setting.

Download PDF
Case Study Healthcare

Healthcare Green Belt Project Examples

Real Green Belt improvement projects completed in Canadian hospital and health organizations.

Download PDF
Case Study Local Government

Yellow Belt Project: 5S Transformation of the PPE Room

How a municipal team applied 5S and visual management to transform their PPE room, with measurable results.

Download PDF
Case Study Local Government

Yellow Belt Project: Improving Job Postings at the City of Kitchener

A municipal HR improvement project that streamlined job posting workflows and reduced internal processing time.

Download PDF
Case Study Manufacturing

Transforming Multiple Manufacturing Sites

How a Canadian manufacturer used Lean to drive consistent improvement across multiple production sites.

Download PDF
Case Study Construction

Sanitary, Drainage and Construction Process Review

A Lean project example showing how structured process review improved coordination and reduced delays in a construction operation.

Download PDF
Case Study Healthcare

Lean Tips for Long-Term Care

Practical starting points for introducing Lean improvement in LTC environments.

Download PDF