End-of-Year Discount: 10% off self-paced online Lean Belt programs until November 30, 2026. View programs →

Client results

What Our Clients Have Achieved

Measurable operational improvements delivered across healthcare, government, manufacturing, and professional services organizations across Canada.

90+ Canadian clients served
100M+ In savings delivered
15-40% Avg. improvement range

Client work

Selected Projects

A cross-section of improvement work delivered across sectors. Names withheld per client confidentiality. Results verified through project documentation.

Emergency Department: Triage to Treatment Flow

A regional hospital engaged our team to redesign patient flow from triage to treatment decision in their emergency department, where wait times were consistently exceeding provincial targets.

  • Current-state value stream mapping with ED clinical and operations staff
  • Waste analysis across triage, registration, bed allocation, and assessment processes
  • Standard work design, visual management implementation, and change management support
Emergency Medicine Value Stream Mapping Patient Flow Standard Work

Hospital Pharmacy: Inventory and Dispensing Safety

A hospital pharmacy sought to reduce inventory carrying costs and eliminate dispensing errors through structured Lean methodology applied to ordering, storage, and dispensing workflows.

  • Lean waste analysis of dispensing workflows and ordering processes
  • Par-level redesign and pull system implementation for high-volume medications
  • Staff training in Lean pharmacy operations and visual management
Pharmacy Operations Inventory Management Cost Reduction Patient Safety

Long-Term Care: Staffing and Service Delivery Review

A 132-bed long-term care home engaged our team to optimize staffing and workflows in alignment with the Fixing Long-Term Care Act (2021) and an emotion-based model of care.

  • On-site shadowing and staff engagement across disciplines
  • Lean workflow review identifying process inefficiencies
  • Gap analysis against an optimal staffing model
Long-Term Care Health Human Resources Workflow Optimization Legislative Compliance

Long-Term Care: Scheduling Review and Master Schedule Redesign

A municipality operating two long-term care homes (244 beds combined) engaged our team to apply Lean methodology to shift filling and scheduling processes.

  • Staff preference survey achieving a 72% response rate
  • Lean waste analysis of shift filling procedures
  • Future-state master schedule design and validation
Scheduling Optimization Staff Engagement Long-Term Care Legislative Compliance

Fleet Services: Reducing Downtime and Improving Asset Availability

A mid-sized Canadian municipality engaged our team to address chronic vehicle downtime and scheduling gaps in fleet services that were limiting frontline service delivery capacity.

  • End-to-end value stream mapping of fleet maintenance intake, scheduling, and dispatch
  • Preventive maintenance standardization and scheduling redesign
  • Visual management and daily accountability system for fleet supervisors
Fleet Management Value Stream Mapping Asset Availability $190K Daily Value Increase

Public Works: Operational Cost Reduction Without New Resources

A municipal public works department needed to reduce operating costs and improve responsiveness to service requests while staying within existing headcount and equipment budgets.

  • Cross-functional waste analysis across core public works service areas
  • Work order management redesign and crew scheduling optimization
  • Standard work documentation for recurring maintenance and service activities
Public Works Cost Avoidance Standard Work $500K+ Annual Savings

Value Stream Mapping: Cycle Time and Cost Reduction

A Canadian manufacturer engaged our team to map and redesign their primary production value stream, where excessive WIP, long changeovers, and scheduling variability were eroding margin.

  • Current-state and future-state value stream mapping with production teams
  • Changeover reduction (SMED) and batch size optimization
  • Pull system design and visual production control boards
Value Stream Mapping SMED Cycle Time 18% Cycle Time Reduction

Kaizen Program: OEE and Automation Readiness

A food manufacturing operation sought to improve overall equipment effectiveness and identify automation opportunities across their packaging lines.

  • OEE baseline measurement and loss categorization
  • Rapid improvement (Kaizen) events focused on top downtime drivers
  • Automation readiness assessment and digital strategy roadmap
OEE Kaizen Automation Readiness Food Manufacturing

Aerospace MRO: Cycle Time Reduction

An aerospace MRO operation engaged our team to reduce aircraft turnaround time and improve scheduling predictability across their maintenance bays.

  • Current-state value stream mapping of maintenance and inspection workflows
  • Constraint analysis and resource levelling across maintenance bays
  • Standard work implementation for high-frequency inspection tasks
MRO Cycle Time Value Stream Mapping Aerospace

Utility Field Operations: Crew Productivity Improvement

A utility provider sought to improve field crew scheduling efficiency and reduce time spent on non-productive activities.

  • Value stream mapping of work order creation, scheduling, and dispatch processes
  • Scheduling redesign to reduce travel time and improve job completion rates
  • Standard work and visual management for field crew supervisors
Field Operations Work Order Management Crew Productivity Utilities

Client Onboarding: Reducing Cycle Time and Rework

A professional services firm engaged our team to redesign their client onboarding process, where excessive handoffs and incomplete documentation were causing delays and client frustration.

  • Current-state process mapping with front-office and back-office teams
  • Waste analysis: identified 40% non-value-added steps in onboarding workflow
  • Future-state design with standardized checklists and single-point accountability
Client Onboarding Process Mapping Waste Reduction 25% Faster Turnaround

Back-Office Operations: Handling Time Reduction

A financial services organization sought to reduce average handling times and error rates across their processing centre without adding staff.

  • Time study and workload analysis across processing functions
  • Queue management redesign and batch-to-flow conversion
  • Error-proofing and standard work implementation for high-volume tasks
Financial Services Handling Time Error Reduction 10% AHT Improvement

Construction: Reducing Project Overruns

A construction firm engaged our team to address chronic schedule overruns and coordination breakdowns across their active project portfolio.

  • Pull planning workshops with project managers and trade supervisors
  • Constraint identification and weekly look-ahead scheduling implementation
  • Daily huddle standardization and visual management on active sites
Pull Planning Schedule Improvement Visual Management Construction

Library System: Holds Processing and Patron Wait Times

A multi-branch library system sought to reduce holds processing time and patron wait time for requested materials.

  • Current-state mapping of intake, cataloguing, and holds fulfillment workflows
  • Batching and routing redesign to reduce processing cycle time
  • Standard work documentation and cross-branch performance measures
Library Operations Holds Processing Staff Capacity Service Speed

Weekly Financial Reporting: 71% Faster Reporting Cycle

A multi-site hospitality and food services operator consolidated weekly site financials by hand, and about half of each reporting cycle went on clarification between Operations and Finance. An operations leader led the fix as a Green Belt project, mentored by LEA.

  • Value stream mapping with Finance and three pilot sites, with regression to confirm which inputs drove errors
  • Standard intake form, locked template, validation checklist and a firm submission cutoff
  • Measured in the pilot: cycle time 12.05 to 3.5 hours, first-pass accuracy 93% to 98%, rework down 83%
Financial Reporting Standard Work Green Belt Project 71% Faster Cycle

F&B Operations: Restocking Time Cut by More Than Half

Front-of-house attendants in a high-volume staff cafeteria each restocked their own way, decanting bulk product during service and blocking the line. A food service team lead took it on as a Green Belt project with LEA mentoring.

  • Day-in-the-life studies, spaghetti diagrams and timed restocking cycles across shifts
  • Kitchen now loads product straight into display-ready containers, with one timed front-of-house routine
  • Measured at the pilot site: restocking cut from 35 to 11 minutes and from 124 to 54 minutes
F&B Operations Kitchen Flow Green Belt Project Up to 69% Faster Restocking

Procurement: Bringing Consumables Back onto Contract

Sites were buying a high-volume consumable outside the operator's national supply agreement. A procurement Green Belt candidate, mentored by LEA, analysed two years of purchasing data across four sites.

  • Spend analysis and process mapping of site ordering across four sites
  • Switched to the contracted equivalent from a supplier already delivering three times a week, and removed a non-essential chemical
  • Updated order guide and procedures, with a monthly contract-compliance report
Procurement Spend Analysis Green Belt Project 17% Lower Unit Cost

Housekeeping: Getting Value from Automation Already on Site

Floors were scrubbed manually while an autonomous scrubber sat largely unused and the team weighed buying more. A facilities Green Belt candidate, mentored by LEA, studied the process before recommending any purchase.

  • 30-day time study, fishbone analysis and FMEA
  • Root cause: staff had not been trained on the machine's controls; unit reprogrammed and staff retrained
  • Measured: an average of 58 minutes of cleaning time saved a day, with no capital spend
Housekeeping Automation Green Belt Project 58 Minutes Saved Daily

Our clients

Organizations we have worked with

Hospitals, health authorities, public health units, municipalities, community agencies, colleges and companies across Canada.

Healthcare, public health and community services (51)

  • Alzheimer Society Peel
  • Canadian Foundation for Healthcare Improvement
  • Canadian Mental Health Association
  • Central Health
  • Centre de santé communautaire du Témiskaming
  • Cornwall Community Hospital
  • Crossroads Children's Mental Health Centre
  • Eastern Ontario Health Unit
  • Extendicare
  • Feed Ontario
  • The Four Villages Community Health Centre
  • Hands TheFamilyHelpNetwork
  • Humber River Health
  • Interior Health
  • Island Health
  • Lakeridge Health
  • LAMP Community Health Centre
  • North Bay Regional Health Centre
  • Northern Health
  • Northwestern Health Unit
  • Nova Scotia Health
  • Ontario Addiction Treatment Centres
  • Ontario Health (Cancer Care Ontario)
  • The Orthotic Group
  • Responsive Group
  • Rideauwood Addiction and Family Services
  • Runnymede Healthcare Centre
  • Sault Area Hospital
  • Shepherd Village
  • SickKids Centre for Community Mental Health
  • Soldiers' Memorial Hospital
  • South Georgian Bay Community Health Centre
  • South Riverdale Community Health Centre
  • St. Joseph's Healthcare Hamilton
  • Street Haven
  • Thresholds Homes and Supports
  • Thunder Bay Counselling
  • Thunder Bay District Health Unit
  • Trillium Health Partners
  • Turning Point Youth Services
  • University Health Network
  • Valoris
  • Vancouver Coastal Health
  • Vanier Community Service Centre
  • Waypoint Centre for Mental Health Care
  • Wellington-Dufferin-Guelph Public Health
  • William Osler Health System
  • Women's College Hospital Foundation
  • Woodview Mental Health and Autism Services
  • Youth Services Jeunesse
  • Youthdale

Municipal and government (25)

  • Belleville
  • Brampton
  • Brantford
  • Cambridge
  • City of Guelph
  • City of Ottawa
  • Clarington
  • Cornwall
  • Delta
  • Durham Region
  • Government of Northwest Territories
  • Grande Prairie
  • Gravenhurst
  • London
  • Mohawk Council of Akwesasne
  • Moose Jaw
  • Niagara Falls
  • Oakville
  • Region of Waterloo
  • Richmond
  • Saugeen Shores
  • St. John's
  • Tillsonburg
  • Town of Paradise
  • York Region

Corporate, industrial and education (18)

  • Agropur
  • Aquatera
  • Bow Valley College
  • Brant InStore
  • Burlodge
  • Cambridge Brass
  • CLEAResult
  • Compass Group
  • Fluor
  • Gescan
  • Kasian
  • Multiplex
  • NorQuest College
  • Parmalat
  • Stantec
  • thyssenkrupp
  • Toronto Metropolitan University
  • TransUnion

Includes work completed prior to transition to Leading Edge Associates.

Resources

Downloadable Case Studies

Case Study Healthcare

Improving Patient Flow Through Structured Care Planning

A Black Belt project showing how structured Lean methodology improved patient flow and reduced wait times in a hospital setting.

Download PDF
Case Study Healthcare

Healthcare Green Belt Project Examples

Real Green Belt improvement projects completed in Canadian hospital and health organizations.

Download PDF
Case Study Local Government

Yellow Belt Project: 5S Transformation of the PPE Room

How a municipal team applied 5S and visual management to transform their PPE room, with measurable results.

Download PDF
Case Study Local Government

Yellow Belt Project: Improving Job Postings at the City of Kitchener

A municipal HR improvement project that streamlined job posting workflows and reduced internal processing time.

Download PDF
Case Study Manufacturing

Transforming Multiple Manufacturing Sites

How a Canadian manufacturer used Lean to drive consistent improvement across multiple production sites.

Download PDF
Case Study Construction

Sanitary, Drainage and Construction Process Review

A Lean project example showing how structured process review improved coordination and reduced delays in a construction operation.

Download PDF
Case Study Healthcare

Lean Tips for Long-Term Care

Practical starting points for introducing Lean improvement in LTC environments.

Download PDF

See What Is Possible in Your Organization

Book a free 30-minute call to discuss your operational priorities and explore where Lean can deliver the most impact.