Client results
What Our Clients Have Achieved
Measurable operational improvements delivered across healthcare, government, manufacturing, and professional services organizations across Canada.
Client work
Selected Projects
A cross-section of improvement work delivered across sectors. Names withheld per client confidentiality. Results verified through project documentation.
Emergency Department: Triage to Treatment Flow
A regional hospital engaged our team to redesign patient flow from triage to treatment decision in their emergency department, where wait times were consistently exceeding provincial targets.
- Current-state value stream mapping with ED clinical and operations staff
- Waste analysis across triage, registration, bed allocation, and assessment processes
- Standard work design, visual management implementation, and change management support
Hospital Pharmacy: Inventory and Dispensing Safety
A hospital pharmacy sought to reduce inventory carrying costs and eliminate dispensing errors through structured Lean methodology applied to ordering, storage, and dispensing workflows.
- Lean waste analysis of dispensing workflows and ordering processes
- Par-level redesign and pull system implementation for high-volume medications
- Staff training in Lean pharmacy operations and visual management
Long-Term Care: Staffing and Service Delivery Review
A 132-bed long-term care home engaged our team to optimize staffing and workflows in alignment with the Fixing Long-Term Care Act (2021) and an emotion-based model of care.
- On-site shadowing and staff engagement across disciplines
- Lean workflow review identifying process inefficiencies
- Gap analysis against an optimal staffing model
Long-Term Care: Scheduling Review and Master Schedule Redesign
A municipality operating two long-term care homes (244 beds combined) engaged our team to apply Lean methodology to shift filling and scheduling processes.
- Staff preference survey achieving a 72% response rate
- Lean waste analysis of shift filling procedures
- Future-state master schedule design and validation
Fleet Services: Reducing Downtime and Improving Asset Availability
A mid-sized Canadian municipality engaged our team to address chronic vehicle downtime and scheduling gaps in fleet services that were limiting frontline service delivery capacity.
- End-to-end value stream mapping of fleet maintenance intake, scheduling, and dispatch
- Preventive maintenance standardization and scheduling redesign
- Visual management and daily accountability system for fleet supervisors
Public Works: Operational Cost Reduction Without New Resources
A municipal public works department needed to reduce operating costs and improve responsiveness to service requests while staying within existing headcount and equipment budgets.
- Cross-functional waste analysis across core public works service areas
- Work order management redesign and crew scheduling optimization
- Standard work documentation for recurring maintenance and service activities
Value Stream Mapping: Cycle Time and Cost Reduction
A Canadian manufacturer engaged our team to map and redesign their primary production value stream, where excessive WIP, long changeovers, and scheduling variability were eroding margin.
- Current-state and future-state value stream mapping with production teams
- Changeover reduction (SMED) and batch size optimization
- Pull system design and visual production control boards
Kaizen Program: OEE and Automation Readiness
A food manufacturing operation sought to improve overall equipment effectiveness and identify automation opportunities across their packaging lines.
- OEE baseline measurement and loss categorization
- Rapid improvement (Kaizen) events focused on top downtime drivers
- Automation readiness assessment and digital strategy roadmap
Aerospace MRO: Cycle Time Reduction
An aerospace MRO operation engaged our team to reduce aircraft turnaround time and improve scheduling predictability across their maintenance bays.
- Current-state value stream mapping of maintenance and inspection workflows
- Constraint analysis and resource levelling across maintenance bays
- Standard work implementation for high-frequency inspection tasks
Utility Field Operations: Crew Productivity Improvement
A utility provider sought to improve field crew scheduling efficiency and reduce time spent on non-productive activities.
- Value stream mapping of work order creation, scheduling, and dispatch processes
- Scheduling redesign to reduce travel time and improve job completion rates
- Standard work and visual management for field crew supervisors
Client Onboarding: Reducing Cycle Time and Rework
A professional services firm engaged our team to redesign their client onboarding process, where excessive handoffs and incomplete documentation were causing delays and client frustration.
- Current-state process mapping with front-office and back-office teams
- Waste analysis: identified 40% non-value-added steps in onboarding workflow
- Future-state design with standardized checklists and single-point accountability
Back-Office Operations: Handling Time Reduction
A financial services organization sought to reduce average handling times and error rates across their processing centre without adding staff.
- Time study and workload analysis across processing functions
- Queue management redesign and batch-to-flow conversion
- Error-proofing and standard work implementation for high-volume tasks
Construction: Reducing Project Overruns
A construction firm engaged our team to address chronic schedule overruns and coordination breakdowns across their active project portfolio.
- Pull planning workshops with project managers and trade supervisors
- Constraint identification and weekly look-ahead scheduling implementation
- Daily huddle standardization and visual management on active sites
Library System: Holds Processing and Patron Wait Times
A multi-branch library system sought to reduce holds processing time and patron wait time for requested materials.
- Current-state mapping of intake, cataloguing, and holds fulfillment workflows
- Batching and routing redesign to reduce processing cycle time
- Standard work documentation and cross-branch performance measures
Resources
Downloadable Case Studies
Improving Patient Flow Through Structured Care Planning
A Black Belt project showing how structured Lean methodology improved patient flow and reduced wait times in a hospital setting.
Download PDFHealthcare Green Belt Project Examples
Real Green Belt improvement projects completed in Canadian hospital and health organizations.
Download PDFYellow Belt Project: 5S Transformation of the PPE Room
How a municipal team applied 5S and visual management to transform their PPE room, with measurable results.
Download PDFYellow Belt Project: Improving Job Postings at the City of Kitchener
A municipal HR improvement project that streamlined job posting workflows and reduced internal processing time.
Download PDFTransforming Multiple Manufacturing Sites
How a Canadian manufacturer used Lean to drive consistent improvement across multiple production sites.
Download PDFSanitary, Drainage and Construction Process Review
A Lean project example showing how structured process review improved coordination and reduced delays in a construction operation.
Download PDFLean Tips for Long-Term Care
Practical starting points for introducing Lean improvement in LTC environments.
Download PDFSee What Is Possible in Your Organization
Book a free 30-minute call to discuss your operational priorities and explore where Lean can deliver the most impact.