Client results
What Our Clients Have Achieved
Measurable operational improvements delivered across healthcare, government, manufacturing, and professional services organizations across Canada.
Case studies
Results our clients have measured
Named clients cite the public document; others are described by type only. Filter by sector or by the kind of impact you are after.
Full case studies
Town of Gravenhurst created 5,192 hours of capacity a year
CIUSSS West-Central Montreal earned Gold-level Lean designation for four units
A multi-site services operator cut its weekly financial reporting cycle by 71% in a three-site pilot
Aquatera realized $980,000 in savings through the Aquatera Way
City of Kitchener targeted a 70% reduction in aggregate write-offs
Kindera Living: Building a Culture of Continuous Quality Improvement
A regulated utility identified $1.7M in annual opportunities
City of Kitchener review identified $190,195 a day in fleet availability
A community hospital reduced falls with harm by 41%
City of Kitchener modernized its market service
A regional health system cut bed turnover from 4 days to 2.25
City of Mississauga built a corporate Lean program of 97 projects
A hospital redesigned how its pharmacy manages inventory
Town of Paradise cut enforcement tracking lead time by 37%
Town of Tillsonburg mapped seven planning application processes ahead of Bill 109
City of Delta reviewed building permit application intake
City of St. John's: a Lean partnership since 2017
A mid-sized city cut its vehicle inspection process from 383 to 36 minutes
A regional government designed one standard planning approvals process for eight offices
A county government cut its payroll cycle time by 37%
Project results
Individual improvement projects, many delivered by the client's own staff as they earned a Lean Six Sigma belt with our coaching.
Sewerage and drainage review identifies condition-based cleaning and better fleet use
Cafeteria restocking time cut from 35 to 11 minutes at the pilot site
Paper work orders replaced with a digital workflow for about 650 orders a year
Changeover time cut from 4 hours to 45 minutes
Centralized consumables inventory supports timely preventive maintenance
Claims processing cycle time reduced by 28%
Four service delivery reviews give enforcement and permitting clear ownership
Admissions moved from three days to same day
58 minutes of cleaning time saved a day with no capital spend
Defects reduced by 60%
One controlled vendor list adopted across four laboratories
25% of capacity freed through workflow redesign
Contact centre scheduling rebuilt around an 80% in 30 seconds service target
Inspection capacity increased by 22%
17% lower contracted price on the highest-volume consumable; savings being confirmed
Throughput increased by 18% through line balancing
Hazardous waste handling standardized with clear roles
Case intake time reduced by 40%
Supply chain review finds 69% of stocked items with low or no movement
156 minutes of process waste removed per employee
Turnover cost model approved by senior leadership, with scope expanded
Green Belt projects coached in a certified quality system
Work-in-progress inventory reduced by 35%
Ticket resolution time improved by 50%
690+ administrative hours recovered a year
Surgical instrument reprocessing cycle time reduced by 40%
Onboarding time projected to fall from ~22 to ~9 hours per new hire
Warehouse rack space use cut by 40% with 5S
Digital timesheets eliminate 10,621 pages of paper a year
Assessment slots right-sized from 90 to 75 minutes to improve access
Health and safety compliance lead time simulated to fall from ~169 to ~70 days
Half an hour saved on every capital invoice
Emergency department wait times reduced by 31%
Recruitment playbook reaches 100% adoption and improves data accuracy by 40%
Urgent care setup time reduced by 42%
60 standard operating procedures created in two months
Nutrition review documentation errors cut by 73.1%
Invoice email delivery wait cut from 2,100 minutes to 1
Vaccine waste held to 0.31% across 333,055 doses
Parks waste collection routes cut diesel cost by $19,872 a year
Contract review time halved, saving 323 hours in three months
About 19 hours saved on each archive request
Lean training program delivery time cut by 69%
Integrated counter services save about $167K a year
Budget reporting modernized, saving $270K
Our clients
Organizations we have worked with
Hospitals, health authorities, public health units, municipalities, community agencies, colleges and companies across Canada.
Healthcare, public health and community services (51)
Municipal and government (25)
Corporate, industrial and education (18)
Includes work completed prior to transition to Leading Edge Associates.
Resources
Downloadable Case Studies
Improving Patient Flow Through Structured Care Planning
A Black Belt project showing how structured Lean methodology improved patient flow and reduced wait times in a hospital setting.
Download PDFHealthcare Green Belt Project Examples
Real Green Belt improvement projects completed in Canadian hospital and health organizations.
Download PDFYellow Belt Project: 5S Transformation of the PPE Room
How a municipal team applied 5S and visual management to transform their PPE room, with measurable results.
Download PDFYellow Belt Project: Improving Job Postings at the City of Kitchener
A municipal HR improvement project that streamlined job posting workflows and reduced internal processing time.
Download PDFTransforming Multiple Manufacturing Sites
How a Canadian manufacturer used Lean to drive consistent improvement across multiple production sites.
Download PDFSanitary, Drainage and Construction Process Review
A Lean project example showing how structured process review improved coordination and reduced delays in a construction operation.
Download PDFLean Tips for Long-Term Care
Practical starting points for introducing Lean improvement in LTC environments.
Download PDFSee What Is Possible in Your Organization
Book a free 30-minute call to discuss your operational priorities and explore where Lean can deliver the most impact.


















































































